Soil Hauling • Material Delivery
Core Transport — A Division of C & D Disposal Services, Inc.
Individual Service · Tank Removal•A Division of C & D Disposal Services, Inc.

Tank Removal Services in New Jersey

Tank removal project support for homeowners and contractors — excavation, soil sampling and testing discussion, and material handling reviewed together for your site, access, and timing, across New Jersey.

Illustrative exposed underground storage tank being excavated with equipment and a safely positioned crew
Scope confirmed for each project. Contact Core to discuss your tank-removal project, the access, any existing reports, and the work needed. The team will confirm the proposed scope and responsibilities before scheduling.
For Homeowners & Contractors

Planning a tank removal? Let's review the project.

Tank removal projects can involve excavation, soil around the tank, and material that needs to move in or out. Core Transport helps homeowners and contractors discuss the excavation, soil testing, and material-handling needs — and coordinates the logistics once the scope is reviewed for the project.

Underground tank projects

Excavation and material-handling support for underground tank removal, including soil export and clean fill backfill where the project requires it.

Excavation support

Dozer and excavator service coordinated for the dig, sequenced with the soil export and any backfill the project calls for.

Soil sampling & testing discussion

Where the project calls for it, soil sampling and testing and site-history review can be discussed as part of the material review.

Material movement

Hauling excavated material off site and delivering clean fill or backfill — both directions coordinated together for the project.

Information Needed to Review a Tank Removal

What helps us review your tank-removal project

Having these details ready speeds up the review. If any are still unknown, that is completely fine — share what you know and the team will help work through the rest.

  • Project town or ZIP
  • Tank type, if known — without guessing; tell the team what you know
  • Tank location — aboveground, underground, or unknown; approximate size if known
  • Access — overhead wires, nearby structures, driveway width, or street staging
  • Existing reports — any available assessment, sampling results, or material documentation
  • Contractor involvement — whether an excavator, environmental contractor, or general contractor is on the project
  • Desired timing for the removal and material movement
From Inquiry to Reviewed Removal

How a tank-removal project starts

A practical three-step path from first contact to proposed scope. No price, availability, or completion time is guaranteed until the review is complete.

1. Share available information

Tell the team your town, whatever you know about the tank, the access, any existing reports, who is involved, and the timing. Anything unknown is fine to leave for the review.

2. Review project requirements

The team reviews the excavation, access, soil testing, and material-handling needs for the individual project — including what is known, what remains unknown, and what else may be needed.

3. Confirm proposed scope & responsibilities

You receive an outline of the proposed excavation, soil export, backfill, and any sampling or testing discussion for approval. Scope and responsibilities are confirmed for each project before any work is scheduled.

Scope & Scheduling Factors

What shapes a tank-removal review

Every project is reviewed on its own conditions. These are the factors the team weighs when confirming tank-removal scope and scheduling for your project.

The tank type and whether it is aboveground, underground, or unknown
Approximate size and location, if known
Excavation scope and the volume of material to remove, if known
Site access — overhead wires, nearby structures, driveway width, and street staging
Whether loading equipment and an operator are on site or need to be coordinated
Any existing reports, sampling results, or material documentation and how they inform the review
Whether soil sampling, testing, or site-history review is needed for the project
Material to bring in (clean fill or backfill) and material to remove, if the project requires it
Any existing contractor and how the removal is sequenced with their work
Desired timing against the excavation and material-movement sequence

The scope and responsibilities — including what Core Transport handles versus what your contractor handles — are confirmed for each project during the review. Contact Core to confirm the proposed scope and responsibilities before scheduling.

Tank Removal Questions

Frequently asked questions

Yes. Tell the team what you do know — the town, whether the tank is aboveground, underground, or unknown, and any access notes — without guessing at specifics. The team reviews the available information and outlines what else may be needed for the project.

Start Your Project Review

Planning a tank removal?

Share your town, whatever you know about the tank, the access, any existing reports, and the timing. The Core Transport team reviews the excavation, soil, and material-handling needs and outlines the proposed scope before any work is scheduled.